June 2008 Build Photos

June build hours: 47
22-Jun-08

Jun 21
|
|
|
A bunch of LED lights |
|
|
|
Keel finaly faired |
|
|
|
|
|

Jun 20
|
|
|
More fairing bog on keel. |
|
|
|
|
|
|
Drill, cutting fluid, brearing holder. |
|
|
|
One 4mm pilot hole and 6mm final size. |
|
|
|
Carbide drill bit. |
|
|
|
|
|
Bearing holders. |
|
|
|
Sanded keel. |
|
|
|
|
|
Final touch up filler. |
|
|
|

Jun 09
|
|
|
|
Keel with more compound on it. |
|
|

Jun 08
|
|
|
Reading lights on right. |
|
|
|
Switches are for white and red LEDs in the cabin. |
|
|

Jun 03
|
|
|
Ground out box corner. |
|
|
|
Wooden axle. |
|
|
|
Epoxy mix on tape covered holders. |
|
|
|
And in place in the box. |
|
|
|
Back side of floor boards. |
|
|
|

Return to Home Page
Return to Photo Gallery
