March 2010 Build Photos

March build hours: 12
13-Mar-10

13 Mar 10
|
|
|
Pins on the mast wires. |
|
|
|
|
Connector in place. |
|
|
|
|
|
Cooler base getting epoxied down. |
|
|
|
Lots of weight to hold it in place. |
|
|
|
|
Supports for the head base. |
|
|
|
Head base with epoxy. |
|
|
|
Head? Porta-Potty? |
|
|
|
|
Tabs filed off. |
|
|
|
Bow rail getting painted. |
|
|
|

11Mar 10
|
|
|
Cooler base before coving with epoxy. |
|
|
|
|
And after. |
|
|
|
|
|
Pole use to stuff the foam up in the mast. |
|
|
|
End so the foam would not turn sideways. |
|
|
|
Foam ready to be pushed up. |
|
|
|
Wires from the holes. |
|
|

Return to Home Page
Return to Photo Gallery
