November 2009 Build Photos

November build hours: 83
28-Dec-09

29 Nov.
|
|
|
Before tie sting. |
|
|
|
After. |
|
|

24 Nov.
|
|
|
Pump control box. |
|
|
|
Bleeding |
|
|
|
|
Letting the air settle out. |
|
|
|
12vcd power outlets |
|
|

15 Nov.
|
|
|
The mess under the boat. |
|
|
|
Where it all goes. |
|
|
|
Buss box wiring. |
|
|
|
Looking from aft forward. |
|
|

10 Nov.
|
|
|
Some of the cabin lighting. |
|
|
|
Red lights lit. |
|
|
|
White lights lit. |
|
|
|
Mess of wiring by the bus boxes. |
|
|
|
Antenna wire and nke bus box by mast. |
|
|
|
|
Connecters for mast wires. |
|
|
|
Wiring under panel before.... |
|
|
|
...and after tidying up. |
|
|
|
Solar panel connector. |
|
|
|
With cover off. |
|
|

Return to Home Page
Return to Photo Gallery
